999视频在线观看_FREE性中国老太HD_国产精品成人国产乱_亚洲av美国av产亚洲av_1024欧美极品_97精品自拍

4黃常見
您的位置: 首頁 ->  ->  常見 -> KBTW Regulator Installation Guide

KBTW Regulator Installation Guide


In order to solve the installation concerns of all customers, the regulator installation guide is made into micro information in the form of text and pictures, so that you can understand the entire installation process of the regulator anytime and anywhere. Now in China's voltage 380V environment with gold protection power KBTW regulator to explain the installation process.
One. Preparation
1.1. Determine the potential customer equipment information: circuit switch A number, voltage regulator capacity, equipment power demand capacity

1.2. Check whether the standard line layout of the 3 and 5 wires is correct. If it is incorrect, correct it.
1.3 Check whether the switching voltage is normal, whether the neutral line is pure, and whether the ground line is effective.
* The normal switching voltage is between 320-460V.
* Neutral line, ensure that it is a pure neutral line from the direct lead of the high voltage transformer,
< * Ground wire, make sure it is connected by a copper pin.
1.4. The customer needs to prepare a voltage regulator input 3 meters long 5-core cable, the square number is the same size as the equipment input, sometimes depending on the situation.

2. Observe the customer's onsite installation environment
2.1 Check whether the number A of the switch on the wall is consistent with the load device, whether the on-off contact of the switch is good, and whether the line value voltage is normal.
2.2 Test the mains input of the regulator with a multimeter, and the normal range of the conventional regulator is within 380V plus or minus 60V. If out of range should remind the customer to order a special range of regulators, so as not to conventional regulators can not meet the current environment of voltage regulation needs.
2.3 Observe the temperature, humidity, oil mist and dust in the air within 10 meters of the pressurizer installation location. If exceeding the standard will affect the service life of the regulator, please customers improve themselves.
Three. Installation work
3.1 Install the voltage regulator end, connect the 3-meter long 5-core cable from the wall switch to the voltage regulator input end, install the voltage regulator input end must be connected to the neutral line, the voltage regulator can work normally.

3.2 Installing the Device End. Generally, the device does not need the neutral line. Only the three-phase live line and ground cable are required

4. Check the work
4.1 Check whether all wiring terminals are secured
4.2 Voltage regulator power-on test no-load voltage and current
4.3 Power on the load device, check whether the phase sequence is correct, and the device is running normally.

400-6480-668

Hello!

金保電源

微信掃一掃

享一對一咨詢

主站蜘蛛池模板: 亚洲最大无码中文字幕网站 | 亚洲精品国产乱码在线看蜜月 | h片在线免费观看 | 国产欧美一区二区三区精品酒店 | 国产三区在线观看视频 | 黄a大片 | 内地老太婆内射内地小矮人内射 | 黄色av入口 | 国产真人性做爰久久网站 | 亚洲免费专区 | 最新国产精品久久精品 | 妇女性内射冈站HDWWWOOO | 国产一区二区丝袜女高跟鞋 | 毛片免费在线观看网站 | 国产视频一区二区三区在线 | 亚洲国产精品无码久久久动漫 | 日韩在线天堂 | 亚洲精品欧美综合四区 | 99亚洲中文字幕精品一区二区 | 丁香五月色情婷婷在线观看 | 一区二区三区在线视频 | 亚洲自偷自偷图片视频专区 | 伊人狠狠色丁香婷婷综合 | 毛片福利视频 | 亚洲国产成人精品女人久久久久 | 日日干网站 | 网飞中文版官网 | 丁香五月成人 | 黄色亚洲片 | 国产精品久久久久影视 | 国产精品福利视频导航 | 国产福利萌白酱精品一区 | 99pao成人国产永久免费视频 | 污网站观看 | 天天干天天弄 | 国产自产一区二区 | 成人性生交大片免费看2 | 18禁男女污污污午夜网站免费暖暖 | 亚洲精品国产一区黑色丝袜 | 2019精品手机国产品在线 | 免费看黄色片网站 |